36 data centers in Atlanta, with the power, kW per rack and liquid cooling each operator publishes.

Atlanta data centers

FacilityCityPowerMax per rackLiquid coolingSource
EdgedAtlanta (Tilford Yard)Atlanta, GA42 MW400 kW400+ kW liquid, 120+ kW air per rack, operator claimYesDataCenter News
DataBankATL6Lithia Springs, GA72 MW100 kW15 kW raised floor, 30 kW slab, 100 kW+ per cabinet HPC, operator pageYesDataBank
DataBankATL5Lithia Springs, GA48 MW100 kW15 kW raised floor, 30 kW slab, 100 kW+ per cabinet HPC, operator pageYesDataBank
FlexentialAtlanta - Douglasville 2Douglasville, GA36 MW80 kWup to 80+ kW per cabinet, operator pageYesFlexential
FlexentialAtlanta - Norcross 2Peachtree Corners, GA4.5 MW80 kW80+ kW per rack, operator pageNot publishedFlexential
FlexentialAtlanta - AlpharettaAlpharetta, GA-80 kW80+ kW per cabinet, operator claimYesFlexential
DataBankATL1Atlanta, GA7.1 MW25 kW10 kW+ per cabinet air, 25 kW+ liquid, operator pageYesDataBank
DataBankATL4Atlanta, GA40 MW10 kW10 kW+ per cabinet (air), operator pageNot publishedDataBank
DataBankATL3Atlanta, GA6 MW10 kW10 kW+ per cabinet (air), operator pageNot publishedDataBank
DataBankATL2Atlanta, GA4 MW10 kW10 kW+ per cabinet (air), operator pageNot publishedDataBank
QTS Data CentersAtlanta 1 (DC1-DC4)Atlanta, GA278 MW-Not publishedQTS Data Centers
EdgeConneXATL11-ATL13 (Union City)Union City, GA202 MW-market data sheet: 100+ kW per cabinet for AI requirementsNot publishedEdgeConneX
STACK InfrastructureATL02Lithia Springs, GA160 MW-Not publishedSTACK Infrastructure
DC BLOXAtlanta East (Rockdale County)Conyers, GA154 MW-Not publishedDC BLOX
SwitchThe Keep (Atlanta)Atlanta, GA150 MW-Switch Atlanta page says up to 2 MW per cabinet (marketing claim, not listed as a facility spec)Not publishedSwitch
DC BLOXAtlanta West (Douglas County)Douglas County, GA120 MW-Not publishedBusiness Wire
CentersquareATL1Lithia Springs, GA81.5 MW-Not publishedCentersquare
QTS Data CentersSuwanee 1 (DC1-DC2)Suwanee, GA50 MW-Not publishedQTS Data Centers
FlexentialAtlanta - Douglasville 1Douglasville, GA22.5 MW-1,500+ W per sq ftYesFlexential
STACK InfrastructureATL01Alpharetta, GA20 MW-Not publishedSTACK Infrastructure
DC BLOXAtlanta (downtown)Atlanta, GA12 MW-Not publishedDC BLOX
Data CanopyAtlanta (Lithia Springs)Lithia Springs, GA10 MW-Not publishedData Canopy
T5 Data CentersT5@Atlanta IIDouglas County, GA10 MW-Not publishedT5 Data Centers
365 Data CentersAlpharettaAlpharetta, GA4.3 MW-Not published365 Data Centers
365 Data CentersSmyrnaSmyrna, GA4 MW-Not published365 Data Centers
EdgeConneXATL01Atlanta, GA2.1 MW-market data sheet: 20+ kW per cabinet for cloud, 100+ kW for AI requirements (covers ATL01, ATL02, ATL11)Not publishedEdgeConneX
FlexentialAtlanta - Norcross 1Norcross, GA1.8 MW-Not publishedFlexential
EdgeConneXATL02Atlanta, GA--Not publishedConverge Digest
EquinixAT4Atlanta, GA--Not publishedEquinix
Aligned Data CentersATL-01Lithia Springs, GA--YesAligned Data Centers
CogentAtlantaAtlanta, GA--Not publishedCogent
Digital RealtyATL13Atlanta, GA--Not publishedDigital Realty
Digital RealtyATL14Atlanta, GA--Not publishedDigital Realty
EquinixAT1Atlanta, GA--Not publishedEquinix
H5 Data CentersAtlantaAtlanta, GA--Not publishedH5 Data Centers
QTS Data CentersFayettevilleFayetteville, GA--Not publishedQTS Data Centers

Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.

Colocation pricing in Atlanta

MeasurePriceSource
Wholesale asking rate, 250-500 kW$185-200 per kW a monthCBRE, H1 2026
Same block, H2 2025$165-185 per kW a monthCBRE, H2 2025
Wholesale asking rate, 500 kW-3 MW$175-185 per kW a monthCBRE, H1 2026
Wholesale asking rate, 3-10 MW$150-175 per kW a monthCBRE, H1 2026
Wholesale asking rate, 10+ MW$150-165 per kW a monthCBRE, H1 2026
Market power rate7.5-11.0 cents per kWhCBRE, H1 2026
Published cabinet price$1,299 per cabinet a monthCyber Wurx, Oct 2026

Wholesale means 250 kW or more; a few servers pay more per kW. All metros: colocation pricing by metro.

The Atlanta market

Small GPU buyers are signing here. In August 2026 QumulusAI took up to 3.75 MW in metro Atlanta for seven years, sized for about 2,048 B300-class GPUs. Sources: Finviz.

Need space in Atlanta? Tell us your spec.

  • A call with our CTO about what you need
  • Ballpark costs and timelines for your budget
  • A straight answer if it’s not a fit

Prefer email? hello@amcompute.com

Need a home for your GPUs? We’ll find it.

Plan a deployment