GPU colocation in Calgary
10 data centers in Calgary, with the power, kW per rack and liquid cooling each operator publishes.
Calgary data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| eStruxtureCAL-3 | Rocky View County, AB | 90 MW | 125 kW125 kW+ per cabinet, operator page | Not published | eStruxture |
| eStruxtureCAL-2 | Rocky View County, AB | 26 MW | 30 kWup to 30 kW per cabinet, higher on request (page also lists 20 kW), operator page | Not published | eStruxture |
| eStruxtureCAL-1 | Calgary, AB | 15 MW | 30 kWup to 30 kW per cabinet, operator page | Not published | eStruxture |
| Qu Data CentresCGY3 | Airdrie, AB | 9 MW | 10 kW5-10 kW per rack, operator page | Not published | Qu Data Centres |
| Qu Data CentresCGY1 | Calgary, AB | 2.6 MW | 10 kW5-10 kW per rack, operator page | Not published | Qu Data Centres |
| Qu Data CentresCGY2 | Calgary, AB | 1.8 MW | 10 kW5-10 kW per rack, operator page | Not published | Qu Data Centres |
| CologixCGY1 | Calgary, AB | 0.4 MW | - | Not published | Cologix |
| EquinixCL1 | Calgary, AB | - | - | Not published | Equinix |
| EquinixCL2 | Calgary, AB | - | - | Not published | Equinix |
| EquinixCL3 | Calgary, AB | - | - | Not published | Equinix |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Calgary market
eStruxture's CAL-3 is due in fall 2026 at 90 MW. It lists 125 kW+ per cabinet. Qu's CGY3 in Airdrie is Uptime Tier III certified at 9 MW. Sources: eStruxture, Qu Data Centres.
Need space in Calgary? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com