GPU colocation in Central Washington
8 data centers in Central Washington, with the power, kW per rack and liquid cooling each operator publishes.
Central Washington data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| CyrusOnePNW1 | Quincy, WA | 36 MW | 17 kW17 kW per cabinet capacity, operator page | Not published | CyrusOne |
| Sabey Data CentersSDC Quincy (Intergate.Quincy) | Quincy, WA | 123 MW | -company-wide claim: facilities engineered for liquid cooling | Not published | Sabey Data Centers |
| Vantage Data CentersWA1 campus (WA11-WA13) | Quincy, WA | 89 MW | - | Not published | Vantage Data Centers |
| Sabey Data CentersSDC Columbia (Intergate.Columbia) | East Wenatchee, WA | 70 MW | -company-wide claim: facilities engineered for liquid cooling | Not published | Sabey Data Centers |
| H5 Data CentersQuincy | Quincy, WA | 40 MW | - | Not published | H5 Data Centers |
| Salcido EnterprisesEller Data Center (Salcido Plaza Two) | East Wenatchee, WA | - | - | Not published | Baxtel |
| CogentQuincy Edge Data Center | East Wenatchee, WA | - | - | Not published | Cogent |
| H5 Data CentersQuincy II and III campus | Quincy, WA | - | - | Not published | H5 Data Centers |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Central Washington market
Quincy holds the large wholesale campuses. Sabey's Quincy campus lists 123 MW across five buildings and Vantage's WA1 campus 89 MW of critical IT load. CyrusOne's PNW1 offers 36 MW of IT capacity at 17 kW per cabinet. Sources: Sabey, Vantage Data Centers, CyrusOne.
Need space in Central Washington? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit