GPU colocation in Houston

13 data centers in Houston, with the power, kW per rack and liquid cooling each operator publishes.

Houston data centers

FacilityCityPowerMax per rackLiquid coolingSource
Switch (formerly Data Foundry)Houston 2Houston, TX-50 kWwater-cooled racks above 50 kW; up to 22 kW airYesSwitch (formerly Data Foundry)
Stream Data CentersHouston I (IAHA1)The Woodlands, TX7.8 MW30 kWhigh density deployments over 30 kW per cabinet, operator pageNot publishedStream Data Centers
EdgeConneXHOU-01Houston, TX-30 kWup to 30 kW per rack, operator pageNot publishedEdgeConneX
Netrality1301 FanninHouston, TX-30 kWpower density ranges 30 kW+, operator pageNot publishedNetrality
DataBankHOU1 Westway ParkHouston, TX23.7 MW25 kW10 kW+ air, 25 kW+ liquid per cabinetYesData Center Map
ServerfarmHTX1Houston, TX410 MW-300 W per sq ft, operator pageNot publishedServerfarm
ServerfarmCTX1Houston, TX100 MW-300 W per sq ft, operator pageNot publishedServerfarm
CyrusOneHouston West campusHouston, TX96 MW-over 1,000 W per sq ft for HPCNot publishedData Center Map
Element CriticalHouston OneKaty, TX26 MW-Not publishedDCD
Skybox DatacentersSkybox Houston IHouston, TX26 MW-YesSkybox Datacenters
DataBankHOU5 GalleriaHouston, TX5.3 MW-Not publishedData Center Map
Digital RealtyIAH10Houston, TX--Not publishedDigital Realty
EquinixHO1Houston, TX--Not publishedEquinix

Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.

Colocation pricing in Houston

MeasurePriceSource
Wholesale asking rate, 250+ kW$165-195 per kW a monthCBRE, H1 2026
Same block, H2 2025$150-185 per kW a monthCBRE, H2 2025
Market power rate7.5-9.5 cents per kWhCBRE, H1 2025
Published cabinet price$675-990 per cabinet a monthLogix (via QuoteColo), Oct 2026
Published cabinet price$1,350-1,360 per cabinet a monthLayerhost, Oct 2026

Wholesale means 250 kW or more; a few servers pay more per kW. All metros: colocation pricing by metro.

The Houston market

New high-density space is coming to Katy. Element Critical is building a 10 MW high-density hall there, with 4.5 MW due by the end of 2026. Switch's Houston 2 offers water-cooled racks above 50 kW. Sources: DCD, Data Foundry.

Need space in Houston? Tell us your spec.

  • A call with our CTO about what you need
  • Ballpark costs and timelines for your budget
  • A straight answer if it’s not a fit

Prefer email? hello@amcompute.com

Need a home for your GPUs? We’ll find it.

Plan a deployment