GPU colocation in Las Vegas
15 data centers in Las Vegas, with the power, kW per rack and liquid cooling each operator publishes.
Las Vegas data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| Novva Data CentersLas Vegas campus | North Las Vegas, NV | 100 MW | -deployments from 250 kW to 30 MW per client | Not published | Novva Data Centers |
| FlexentialLas Vegas - North | North Las Vegas, NV | 9 MW | -power density 1,500 W per sq ft | Yes | Flexential |
| DataBankLAS1 | Las Vegas, NV | 3.4 MW | - | Not published | DataBank |
| FlexentialLas Vegas - Downtown | Las Vegas, NV | 1.4 MW | -power density 150+ W per sq ft | Not published | Flexential |
| EdgeConneXLAS01 | Las Vegas, NV | 0.8 MW | -capable of 20+ kW per cabinet, 600+ W per sq ft (operator data sheet) | Not published | EdgeConneX |
| SwitchLAS VEGAS 10 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 11 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 12 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 2 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 4 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 5 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 7 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 8 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLAS VEGAS 9 (The Core Campus) | Las Vegas, NV | - | -campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page) | Not published | SEC filing |
| SwitchLas Vegas AI factories (Jones Blvd and 215 Beltway) | Las Vegas, NV | - | - | Not published | Switch |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Las Vegas market
Switch's Core Campus is planned for 495 MW. Flexential's Las Vegas North lists 9 MW of critical power with liquid cooling built in. Novva's North Las Vegas campus has a 100 MW on-campus substation. Sources: Switch, Flexential, Novva.
Need space in Las Vegas? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com