GPU colocation in Las Vegas

15 data centers in Las Vegas, with the power, kW per rack and liquid cooling each operator publishes.

Las Vegas data centers

FacilityCityPowerMax per rackLiquid coolingSource
Novva Data CentersLas Vegas campusNorth Las Vegas, NV100 MW-deployments from 250 kW to 30 MW per clientNot publishedNovva Data Centers
FlexentialLas Vegas - NorthNorth Las Vegas, NV9 MW-power density 1,500 W per sq ftYesFlexential
DataBankLAS1Las Vegas, NV3.4 MW-Not publishedDataBank
FlexentialLas Vegas - DowntownLas Vegas, NV1.4 MW-power density 150+ W per sq ftNot publishedFlexential
EdgeConneXLAS01Las Vegas, NV0.8 MW-capable of 20+ kW per cabinet, 600+ W per sq ft (operator data sheet)Not publishedEdgeConneX
SwitchLAS VEGAS 10 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 11 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 12 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 2 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 4 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 5 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 7 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 8 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLAS VEGAS 9 (The Core Campus)Las Vegas, NV--campus-wide claim: up to 2 MW per cabinet (Switch Las Vegas page)Not publishedSEC filing
SwitchLas Vegas AI factories (Jones Blvd and 215 Beltway)Las Vegas, NV--Not publishedSwitch

Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.

The Las Vegas market

Switch's Core Campus is planned for 495 MW. Flexential's Las Vegas North lists 9 MW of critical power with liquid cooling built in. Novva's North Las Vegas campus has a 100 MW on-campus substation. Sources: Switch, Flexential, Novva.

Need space in Las Vegas? Tell us your spec.

  • A call with our CTO about what you need
  • Ballpark costs and timelines for your budget
  • A straight answer if it’s not a fit

Prefer email? hello@amcompute.com

Need a home for your GPUs? We’ll find it.

Plan a deployment