GPU colocation in Los Angeles
19 data centers in Los Angeles, with the power, kW per rack and liquid cooling each operator publishes.
Los Angeles data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| Prime Data CentersLAX01 | Vernon, CA | 33 MW | 120 kWup to 40 kW per rack air-cooled; up to 120 kW per rack with liquid cooling | Yes | DCD |
| DataBankLAX2 | Vernon, CA | 32 MW | 10 kW10 kW+ per cabinet air-cooled, operator page | Not published | DataBank |
| DataBankSNA2 | Irvine, CA | 8 MW | 10 kW10 kW+ per cabinet air-cooled, operator page | Not published | DataBank |
| DataBankSNA1 | Irvine, CA | 2.6 MW | 5 kW5 kW+ per cabinet air-cooled, operator page | Not published | DataBank |
| EvocativeLAX14 | Redondo Beach, CA | 20 MW | - | Not published | Evocative |
| CoreSiteLA3 | Los Angeles, CA | 18 MW | - | Yes | CoreSite |
| ServerfarmLAX1 | El Segundo, CA | 17.3 MW | - | Not published | Data Center Map |
| CentersquareLAX3 | Irvine, CA | 9.2 MW | - | Not published | Centersquare |
| CentersquareLAX5 | Irvine, CA | 5.6 MW | - | Not published | Centersquare |
| CentersquareLAX4 | Hawthorne, CA | 2.7 MW | - | Not published | Centersquare |
| CoreSiteLA1 (One Wilshire) | Los Angeles, CA | - | - | Not published | Business Wire |
| CoreSiteLA2 | Los Angeles, CA | - | - | Yes | CoreSite |
| EquinixLA4 | El Segundo, CA | - | - | Not published | Equinix |
| Digital RealtyBUR10 | Burbank, CA | - | - | Not published | Digital Realty |
| Digital RealtyLAX10 | Los Angeles, CA | - | - | Not published | Digital Realty |
| Digital RealtyLAX11 | El Segundo, CA | - | - | Not published | Digital Realty |
| EquinixLA3 | El Segundo, CA | - | - | Not published | Equinix |
| EquinixLA7 | Torrance, CA | - | - | Not published | Equinix |
| Telehouse AmericaLos Angeles (626W) | Los Angeles, CA | - | - | Not published | Telehouse America |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Los Angeles market
Need space in Los Angeles? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com