GPU colocation in Miami and South Florida
16 data centers in Miami and South Florida, with the power, kW per rack and liquid cooling each operator publishes.
Miami data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| EdgeConneXMIA02 | Miami, FL | 6 MW | 20 kWcapable of 20+ kW per cabinet (Miami data sheet) | Not published | EdgeConneX |
| EdgeConneXMIA01 | Miami, FL | 1.5 MW | 20 kWcapable of 20+ kW per cabinet (Miami data sheet) | Not published | EdgeConneX |
| FlexentialFort Lauderdale | Fort Lauderdale, FL | 3.1 MW | - | Not published | Flexential |
| QTS Data CentersMiami 1 | Miami, FL | 2 MW | - | Not published | QTS Data Centers |
| DataBankMIA1 | Miami, FL | 1.6 MW | - | Not published | DataBank |
| 365 Data CentersBoca Raton | Boca Raton, FL | - | - | Not published | 365 Data Centers |
| 365 Data CentersFort Lauderdale | Fort Lauderdale, FL | - | - | Not published | 365 Data Centers |
| CogentBoca Raton | Boca Raton, FL | - | - | Not published | Cogent |
| CogentHollywood, FL | Pembroke Park, FL | - | - | Not published | Cogent |
| CogentMiami | Miami, FL | - | - | Not published | Cogent |
| CoreSiteMI1 | Miami, FL | - | - | Not published | CoreSite |
| Digital RealtyMIA10 | Miami, FL | - | - | Not published | Digital Realty |
| EquinixMI1 | Miami, FL | - | - | Not published | Equinix |
| EquinixMI2 | Miami, FL | - | - | Not published | Equinix |
| EquinixMI3 | Boca Raton, FL | - | - | Not published | Equinix |
| EquinixMI6 | Doral, FL | - | - | Not published | Equinix |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Miami market
Equinix MI1 downtown has 255,513 sq ft of colocation space. EdgeConneX lists 1.5 MW at MIA01 and 6 MW at MIA02. Sources: Equinix, EdgeConneX.
Need space in Miami? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com