5 data centers in Ottawa-Gatineau, with the power, kW per rack and liquid cooling each operator publishes.
Ottawa data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| Qu Data CentresOTT3 | Ottawa (Kanata), ON | 2 MW | 15 kW5-15 kW per rack, operator page | Not published | Qu Data Centres |
| PureColoRiverside Drive | Ottawa, ON | - | 15 kWa single AI rack in one room can draw up to 15 kW, per OBJ | Not published | Ottawa Business Journal |
| EquinixOT1 | Gatineau, QC | - | - | Not published | Equinix |
| PureColoMarch Road (Kanata) | Ottawa (Kanata), ON | - | - | Not published | Ottawa Business Journal |
| Qu Data CentresOTT2 | Ottawa (Nepean), ON | - | -5+ kW per rack, operator page | Not published | Qu Data Centres |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Ottawa market
Qu runs two Ottawa data centres. OTT3 in Kanata is Tier III certified, with 2 MW upgradeable to 10 MW; OTT2 is in Nepean. Equinix's OT1 is across the river in Gatineau. Sources: Qu Data Centres, Equinix.
Need space in Ottawa? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit