GPU colocation in Ottawa-Gatineau

5 data centers in Ottawa-Gatineau, with the power, kW per rack and liquid cooling each operator publishes.

Ottawa data centers

FacilityCityPowerMax per rackLiquid coolingSource
Qu Data CentresOTT3Ottawa (Kanata), ON2 MW15 kW5-15 kW per rack, operator pageNot publishedQu Data Centres
PureColoRiverside DriveOttawa, ON-15 kWa single AI rack in one room can draw up to 15 kW, per OBJNot publishedOttawa Business Journal
EquinixOT1Gatineau, QC--Not publishedEquinix
PureColoMarch Road (Kanata)Ottawa (Kanata), ON--Not publishedOttawa Business Journal
Qu Data CentresOTT2Ottawa (Nepean), ON--5+ kW per rack, operator pageNot publishedQu Data Centres

Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.

The Ottawa market

Qu runs two Ottawa data centres. OTT3 in Kanata is Tier III certified, with 2 MW upgradeable to 10 MW; OTT2 is in Nepean. Equinix's OT1 is across the river in Gatineau. Sources: Qu Data Centres, Equinix.

Need space in Ottawa? Tell us your spec.

  • A call with our CTO about what you need
  • Ballpark costs and timelines for your budget
  • A straight answer if it’s not a fit

Prefer email? hello@amcompute.com

Need a home for your GPUs? We’ll find it.

Plan a deployment