GPU colocation in Pittsburgh
9 data centers in Pittsburgh, with the power, kW per rack and liquid cooling each operator publishes.
Pittsburgh data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| Ardent Data CentersPittsburgh | McKees Rocks, PA | 12 MW | 135 kWUp to 135+ kW per rack, operator page | Yes | Ardent Data Centers |
| EdgeConneXPIT01 | Pittsburgh, PA | 1 MW | 20 kWCapable of 20+ kW per cabinet, operator data sheet | Not published | EdgeConneX |
| DataBankPIT2 | Pittsburgh, PA | 5 MW | -Operator page: 10 kW+ cabinet density on air | Not published | DataBank |
| ExpedientPIT2 | Pittsburgh, PA | 4.2 MW | - | Not published | Expedient |
| DataBankPIT1 | Pittsburgh, PA | 1.9 MW | -Operator page: 10 kW+ cabinet density on air | Not published | DataBank |
| ExpedientPIT1 | Pittsburgh, PA | 1.8 MW | - | Not published | Expedient |
| CogentPittsburgh Data Center | Pittsburgh, PA | - | - | Not published | Cogent |
| H5 Data CentersPittsburgh | Pittsburgh, PA | - | - | Not published | H5 Data Centers |
| TECfusionsKeystone Connect | New Kensington, PA | - | - | Yes | TECfusions |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Pittsburgh market
Ardent lists racks above 135 kW in McKees Rocks. It has 2.4 MW of IT available now and 12 MW planned by 2027. DataBank's PIT1 at Nova Place hosts the Pittsburgh Internet Exchange. Sources: Northern Data, DataBank.
Need space in Pittsburgh? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com