GPU colocation in Reno
9 data centers in Reno, with the power, kW per rack and liquid cooling each operator publishes.
Reno data centers
| Facility | City | Power | Max per rack | Liquid cooling | Source |
|---|---|---|---|---|---|
| ColovoreRNO02 | Reno, NV | 16 MW | 600 kWoperator market page cites 5-600+ kW per rack, HVDC-ready | Yes | Colovore |
| ColovoreRNO01 | Sparks, NV | 6 MW | 250 kW250 kW per rack announced at groundbreaking; operator market page cites 5-600+ kW per rack | Yes | Colovore |
| SwitchTAHOE RENO 2 (The Citadel Campus) | Tahoe Reno Industrial Center, NV | 55 MW | 55 kWup to 55 kW per cabinet, Switch datasheet | Not published | Switch |
| Vantage Data CentersNV1 (Reno campus) | Sparks, NV | 224 MW | -360-720 W per sq ft | Planned | Vantage Data Centers |
| EdgeCore Digital InfrastructureReno campus | Tahoe Reno Industrial Center, NV | 216 MW | - | No | EdgeCore Digital Infrastructure |
| SwitchTAHOE RENO 1 (The Citadel Campus) | Tahoe Reno Industrial Center, NV | 130 MW | - | Not published | SEC filing |
| Novva Data CentersTahoe Reno campus | Tahoe Reno Industrial Center, NV | 100 MW | -deployments from 250 kW to 30 MW per client | Not published | Novva Data Centers |
| PowerHouse Data CentersPowerHouse Reno | Tahoe Reno Industrial Center, NV | 65 MW | - | Not published | NNBW |
| SwitchTAHOE RENO 3 (The Citadel Campus) | Tahoe Reno Industrial Center, NV | - | - | Not published | Switch |
Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.
The Reno market
Switch's Tahoe Reno campus anchors the market. Switch's Tahoe Reno 2 datasheet lists up to 55 MW and 55 kW per cabinet. Vantage's NV1 campus in Sparks plans 224 MW of critical IT load, with liquid cooling for GPU loads. Sources: Switch, Vantage Data Centers.
Need space in Reno? Tell us your spec.
- A call with our CTO about what you need
- Ballpark costs and timelines for your budget
- A straight answer if it’s not a fit
Prefer email? hello@amcompute.com