GPU colocation in Reno

9 data centers in Reno, with the power, kW per rack and liquid cooling each operator publishes.

Reno data centers

FacilityCityPowerMax per rackLiquid coolingSource
ColovoreRNO02Reno, NV16 MW600 kWoperator market page cites 5-600+ kW per rack, HVDC-readyYesColovore
ColovoreRNO01Sparks, NV6 MW250 kW250 kW per rack announced at groundbreaking; operator market page cites 5-600+ kW per rackYesColovore
SwitchTAHOE RENO 2 (The Citadel Campus)Tahoe Reno Industrial Center, NV55 MW55 kWup to 55 kW per cabinet, Switch datasheetNot publishedSwitch
Vantage Data CentersNV1 (Reno campus)Sparks, NV224 MW-360-720 W per sq ftPlannedVantage Data Centers
EdgeCore Digital InfrastructureReno campusTahoe Reno Industrial Center, NV216 MW-NoEdgeCore Digital Infrastructure
SwitchTAHOE RENO 1 (The Citadel Campus)Tahoe Reno Industrial Center, NV130 MW-Not publishedSEC filing
Novva Data CentersTahoe Reno campusTahoe Reno Industrial Center, NV100 MW-deployments from 250 kW to 30 MW per clientNot publishedNovva Data Centers
PowerHouse Data CentersPowerHouse RenoTahoe Reno Industrial Center, NV65 MW-Not publishedNNBW
SwitchTAHOE RENO 3 (The Citadel Campus)Tahoe Reno Industrial Center, NV--Not publishedSwitch

Sorted by published density, the operator's own figure. Other metros: GPU colocation directory.

The Reno market

Switch's Tahoe Reno campus anchors the market. Switch's Tahoe Reno 2 datasheet lists up to 55 MW and 55 kW per cabinet. Vantage's NV1 campus in Sparks plans 224 MW of critical IT load, with liquid cooling for GPU loads. Sources: Switch, Vantage Data Centers.

Need space in Reno? Tell us your spec.

  • A call with our CTO about what you need
  • Ballpark costs and timelines for your budget
  • A straight answer if it’s not a fit

Prefer email? hello@amcompute.com

Need a home for your GPUs? We’ll find it.

Plan a deployment