How to deploy a B300 cluster, step by step

Nine steps and six counterparties before the first job runs. We line up all of them for a flat $25K, not a percentage of your project.

Six counterparties, or one

On your own

  • Server vendor
  • NVIDIA compliance
  • Network vendor
  • Data center
  • Freight and insurer
  • Installer

You deal with each of them directly.

  • Six contracts, six contacts, six timelines.
  • One missing form or a site without power holds everything.
  • An infrastructure engineer, about $150K a year (American Compute).

With us

  • Server vendor
  • NVIDIA compliance
  • Network vendor
  • Data center
  • Freight and insurer
  • Installer

American Compute deals with each of them for you.

  • One team lines up every party, in your name.
  • No preferred vendors. You get the best price on the market right now.
  • A flat $25K for 1-7 servers, not a percentage of the project.

Nine steps from quote to first job

Before the order

  1. Size it

    Servers, network, storage and power.

    Who you deal with: Your team. Ballpark: Bill of materials builder.

  2. Get quotes

    Entity details, a credit application and NVIDIA’s end-use forms come before any firm quote.

    Who you deal with: Vendors, NVIDIA compliance. Ballpark: Best price on the market now.

Order to delivery

  1. Order

    Weeks if in stock, five to six months from the factory.

    Who you deal with: Server vendor. Ballpark: 20-50% deposit.

  2. Sign a data center

    High-density colocation, about 15 kW per server, usually on a 3-year contract.

    Who you deal with: Data center. Ballpark: $240-325 per kW a month.

  3. Ship and insure

    Freight from the vendor, insured from the factory door.

    Who you deal with: Freight and insurer. Ballpark: $2,500 per server.

Bring-up and run

  1. Rack and network

    Power, racking and an 800G network of switches, optics and cables.

    Who you deal with: Installer, network vendor. Ballpark: $50-90K per server.

  2. Burn in

    Stress-test every GPU and the links between servers before you accept them.

    Who you deal with: Installer. Ballpark: NVIDIA DCGM, NCCL tests.

  3. Hand over

    Drivers, CUDA, and Kubernetes or Slurm.

    Who you deal with: Your team. Ballpark: NVIDIA GPU Operator.

  4. Run it

    Monitoring, repairs and warranty claims.

    Who you deal with: Server vendor. Ballpark: For the life of the servers.

Where B300 projects stall

  • An order held for a form

    Vendors won’t ship until NVIDIA’s end-use forms check out.

  • Servers with nowhere to go

    Hardware that arrives before the site has power sits in storage, already paid for.

  • Lead times that slip

    The cheapest factory orders can take five to six months.

  • Bad GPUs found late

    Skip burn-in, and failures show up after you’ve accepted the servers.

What four B300 servers cost

  • Upfront

    $2.6M

    • Servers $2.2M
    • Networking $220K
    • Shipping and our setup $35K
    • Install, storage and colo setup $109K
  • Each month

    $24K

    • Data center $17K
    • Management $1K
    • Parts, bandwidth and insurance $6K
  • Our fee

    $25K

    • Flat, for 1-7 servers. 8 or more quoted
    • Not a commission or a percentage of the project
    • 1% of this build alone would be $26K

Ballpark, October 2026, at $550K per server. Colocation at $280 per kW a month. After parts, bandwidth and insurance; before taxes and financing.

Plan your B300 deployment.

  • A call with our CTO about what you need
  • Ballpark costs and timelines for your budget
  • A straight answer if it’s not a fit

Prefer email? hello@amcompute.com

Deployment questions

How long does it take to deploy a B300 cluster?
Smaller deployments usually go live in 60-90 days. Servers that ship within weeks cost more, and the cheapest factory orders can take five to six months.
Can I deploy GPU servers myself?
Yes, if you can line up the server vendor, NVIDIA’s compliance check, a network vendor, a data center, freight and insurance, and an installer, then handle repairs for years. One missing form or a site without power can hold the project for weeks.
What paperwork do vendors ask for?
The buying entity’s details, a credit application or a deposit, and NVIDIA’s end-use forms, which name the buyer, the site, and what the GPUs are for.
Do I need InfiniBand?
Not for one server. A cluster needs a fast network between servers, either InfiniBand or 800G Ethernet with RoCE, at about $50-90K per server.
What do you charge to deploy it for me?
A flat $25K setup for 1-7 servers, half at signing and half when live, quoted for 8 or more. Management from $1K a month per 4 servers. It is not a commission or a percentage of project cost. On a $2.6M four-server build, 1% alone would be $26K. We have no preferred vendors, so you get the best price on the market right now and pay the vendor directly.

Want B300s without the headache? We’ll run them.